Schlumberger (www.slb.com)


                 
Resources
Case Studies
Curve Mnemonic Dictionary
Free Software Utilities
Oilfield Glossary
Premium Content
E-mail Subscriptions
Publications
Catalogs
Industry Articles
Middle East and Asia Reservoir Review
Oilfield Review
Reference Books
Reservoir Optimization Conferences
Rig Count
Supply Chain Services
Technical Papers

Print-friendly view E-mail this page Give us your feedback for Well Testing Industry Articles


Well Testing Industry Articles


2009
Feb Multiphase Flowmeter and Sampling System Yield Real-Time Wellsite Results (507 KB PDF) World Oil
may Innovative Test Equipment Expedites Data Availability (888 KB PDF) E&P
2008
Dec Technology Applications: Well-Test Separator (808 KB PDF) JPT
Nov Heavy Lifting Solved in Venezuela (598 KB PDF) E&P
Oct PhaseSampler (Spanish) (567 KB PDF) Petroleum
Oct Schlumberger Test Trees, Real-Time Multipoint Monitoring Speed Up Atlantis Completions (400 KB PDF) Oil & Gas Financial Journal
Oct Wellsite Multiphase Fluid Sampling and Analysis Service Introduced (479 KB PDF) E&P
Sep Testing for Life (487 KB PDF) JPT
Sep Multiphase-Environment Sampling (582 KB PDF) JPT
Aug Multiphase Flowmeter Yields Accurate Test Measurements on Alberta SAGD Well (557 KB PDF) World Oil
Aug Multiphase Flow Metering for SAGD Wells Introduced (585 KB PDF) E&P
Jun Fast-acting Well Control Boosts Efficiency (664 KB PDF) E&P
Jun Anatomy of a Completion (550 KB PDF) Petroleum Africa
May Well Control & Intervention Tools — Planning for Success (735 KB PDF) Petroleum Africa
May Thirst and starvation for oil (91 KB PDF) Offshore
Apr Production fluid evaluation saves opex, capex (191 KB PDF) Offshore
Mar SenTREE HP Tech Trend Article (3.01 MB PDF) JPT
2007
Dec Schlumberger Delivers Innovative Technologies and Collaborative Support to the Kikeh Development (681 KB PDF) Oil & Gas Financial Journal
Dec New Deposition Testing Improves Flow Assurance (329 KB PDF) E&P
Sep Identifying Condensate Banking with Multiphase Flowmeters (872 KB PDF) JPT
Sep The High-Tech World of Testing (646 KB PDF) JPT
Aug New PVT Sampler Saves Operation Time (186 KB PDF) Scandinavian Oil-Gas Magazine
Jul Real-time Tests Make Fiscal Sense (760 KB PDF) Deepwater Development
Jun Sampler Eliminates Wireline Run (325 KB PDF) E&P
May Providing Answers for Untestable Wells (956 KB PDF) Offshore
Apr Multiphase Flowmeter Optimizes Heavy Oil Production off Congo
(1.2 MB PDF)
Oil & Gas Journal
Mar Combining Leading-Edge Global Technology with Local Knowledge
(1.6 MB PDF)
E&P
Mar Production-Well-Testing Optimization with Multiphase Flowmeters
(1.2 MB PDF)
JPT
2006
April Opening the Multiphase Envelope (427 KB PDF) Offshore Engineer
May Accurately Measuring Multiphase Flow Rates in Conditions Once Considered Untestable (1.4 MB PDF) Offshore
2005
June Schlumberger SenTREE HP Subsea Completion (85 KB PDF) Oil & Gas Eurasia
Sep Closing the Flow Assurance Loop (187 KB PDF) E&P
2004
June New Testing, Clean-Up Techniques Meet Demanding Requirements (139 KB PDF) Offshore
December Schlumberger Incorporates Wet Gas Conditions Into Multiphase Metering (78 KB PDF) Eurasia Oil & Gas
2003
July Dewatering Facility Provides Production Optimization, Water Management Solutions (96 KB PDF) Offshore
Oct Compact Multiphase Meters Take Tradition to Task (138 KB PDF) Offshore
Nov/Dec Paving the Way to Improved Subsea Productivity (138 KB PDF) Scandinavian Oil-Gas Magazine
2001
Jun Gulf Team Delivers on DP Drillship Promise (404 KB PDF) Offshore Engineer


Related resources