Products & Services
About Us
Investors
Newsroom
HSE
Careers
Alumni
Resources
Contact
Resources
Case Studies
Curve Mnemonic Dictionary
Free Software Utilities
Oilfield Glossary
Premium Content
E-mail Subscriptions
Publications
Rig Count
Supply Chain Services
Technical Papers
Recently viewed pages
Unconventional Gas Technical Papers
Carbon Services Case Studies
IPM at a Glance
Antenna Products
You are here:
SLB.com
>
Resources
>
Case Studies
> Completions
Completion Case Studies
Spotlight
RapidSeal Peace River project case study, Canada
Level 3 multilateral wells increase production sixfold in Canada
more...
Show only Completions case studies from
Asia (3)
Canada (2)
Gulf of Mexico (5)
Mexico and Central America (1)
North Africa (1)
North Sea (30)
South America (5)
US South (2)
US West (3)
West Africa (5)
Case studies index
Continuous Measurement of Permeability for CO
2
Storage Modeling
Measuring Residual CO
2
Saturation Near an Injection Well
Deep Water
60 Million Barrels Additional Reserves Estimated
DeepCRETE Reduces Wait on Cement Time to Five Hours in Deepwater
Intelligent Completion Accelerates Production Offshore Norway
Intelligent Completion Facilitated Development and Accelerated Production Offshore Nigeria
PERFPAC Service Reduces Formation Damage, Saves Rig Time in West African Deepwater Play
Prevent Fluid Loss in Deepwater Well
Successfully Install Isolation Valves for Deepwater Project
TRUST Technique Aids BP with Single Trip Solution for Underbalanced Zone in the Gulf of Mexico
Intelligent Completions
Fiber-Optic Distributed Temperature Sensors Help Extend Well Life and Increase Recovery
Fiber-Optic Full Temperature Profile Detects Fluid Migration
Groupement Sonatrach-Agip Gives FIV Technique Top Marks in Algeria's Berkine Basin
Intelligent Completion Accelerates Production Offshore Norway
Intelligent Completion Facilitated Development and Accelerated Production Offshore Nigeria
Intelligent Completion Raise North Sea Production
Preindexing Minimized Equipment and Reduced Time to Production
Production Increased Fivefold By Managing Drawdown
Real-Time Gas Lift Well Monitoring Optimizes Performance
Real-Time Monitoring Detects Early Steam Breakthrough
Sensa Demonstrated the Ability to Continuously Monitor the Well During Critical Operations
Sensa Provides a Full Temperature Profile Along the Wellbore, Avoiding Costly Well Intervention
Sensa Provides Real-time Data for Assessing Horizontal Steamflood Completions
Wellbore Monitoring Offers Option to Costly Intervention
WellWatcher Flux System Permits Permanent Subsea Monitoring
Isolation Valves
FIV Formation Isolation Valve Local Inventory Ensures That Client Achieves Schedule Goals
FIV Formation Isolation Valves Installed on Short Notice
FIV Formation Isolation Valves Protect Reservoirs from Fluid Damage
Formation Isolation Valves Reduce Well Intervention Costs
Isolate Formation in High-Pressure, High-Temperature Wells
Prevent Fluid Loss in Deepwater Well
Reduce Formation Damage in Sand Control Completions
Successfully Install Isolation Valves for Deepwater Project
Multilaterals
RapidConnect Connects Multiple Sections of a Fault-isolated Producing Zone
RapidConnect Multilateral Technology Brings on New Production at Lower Capital Expense and Reduced Operating Cost
RapidTieback Level 3 Multilateral Wells Increase Production Sixfold in Canada
North Sea Efficiency
Increased Production Using Permanent Gauges
Permanent Gauge Data Used to Increase Production 8000 BOPD
Permanent Gauges Eliminate Need for Gravel Pack
ResFlow ICD Screens Improve Well Cleanup and Delay Water Cut
ResInject ICD Offers Potential for 1%–10% Increase in Oil Recovery
Perforating
eFire Eliminates Need for Traditional Method of Perforating on Slickline, Saving Cost and Time
Permanent Monitoring
60 Million Barrels Additional Reserves Estimated
Field Estimates Revised Based on Permanent Gauge Data
Increased Production Using Permanent Gauges
Optimize Critical Well Testing Operations in Real Time
Permanent Gauge Data Used to Increase Production 8000 BOPD
Permanent Gauge Systems Provide More Than $2 Million in Benefits
Permanent Gauges Eliminate Need for Gravel Pack
PressureWatch Sapphire Gauge Helps YPF Determine Water Injection Strategy
Safety Valves
Custom-Designed Seal System Prevents Need for Workovers
TRC-II Safety Valve Ensures Operation in Ultradeepwater Environment
TRMAXX Safety Valves Protect Reservoir and Environment
Sand Control
FIV Formation Isolation System Improves Underbalanced Perforating
Isolation Valve Minimizes Formation Damage when Perforating
Monitoring of Openhole Completion Provides Rapid Feedback from Wells in Early Production
PERFPAC Service Reduces Formation Damage, Saves Rig Time in West African Deepwater Play
QUANTUM MAX Gravel-Pack System Helps Increase Gas Production by 45%
Reduce Formation Damage in Sand Control Completions
ResFlow ICD Screens Improve Well Cleanup and Delay Water Cut
ResInject ICD Offers Potential for 1%–10% Increase in Oil Recovery
Single-Trip Completion Maximizes Deliverability and Longevity
Underbalanced No-Kill Perforating Maintains High PIs
Water-Pack Design Helps Increase Productivity Index by 10%
Request more information
about Completion services and other Schlumberger innovations.