Schlumberger (www.slb.com)


                 
Products & Services
Artificial Lift
Cementing
Coiled Tubing
Completions
Consulting & Data Services
Drilling
Formation Evaluation
Integrated Project
Management
Production Optimization
Seismic Services
Software
Stimulation
Fracturing
Matrix
Sand Control
Scale Control
Offshore Vessels
Subsea
Well Testing
Additional Services
Reservoir Challenges

Print-friendly view E-mail this page Give us your feedback for AbrasiFRAC


AbrasiFRAC

Spotlight


StageFRAC Animation
View AbrasiFRAC animation
part of the Contact service offering.

Case Studies


AbrasiFRAC Technology Saves USD 750,000 in Completion Costs

Cut Multistage Fracturing Time by 15 Days

Increase Gas Production While Reducing Water Cut

AbrasiFRAC

The AbrasiFRAC service perforates and stimulates multiple intervals in the well in a single field operation, offering better access in less time. The technique enables accurate placement of fracturing treatments down the CT-casing annulus. It permits the pressure required to initiate the fracture to be significantly reduced.

Slurry containing abrasive solids is pumped at high differential pressures through a specially designed jet gun conveyed on a CT workstring. The resulting high-velocity fluid stream can perforate tubulars (casing, liner, predrilled/slotted liner, and tubing) and any surrounding cement, then penetrate deep into the formation. Even in harsh environments, the jet guns will perform efficiently for several hours under downhole conditions.

For multiple-stage treatments, sand plugs or bridge plugs can be used for zonal isolation between the fracturing treatment stages. With the use of a retrievable or millable bridge plug, the AbrasiFRAC service can isolate, perforate, and fracture multiple zones in a single field operation. Jetting guns are available in various sizes and phasing configurations.

Related resources

Request more information about AbrasiFRAC and other Schlumberger innovations.