Schlumberger (www.slb.com)


                 
Products & Services
Artificial Lift
Cementing
Coiled Tubing Services
Completions
Consulting & Data Services
Drilling
Formation Evaluation
Integrated Project
Management
Production Optimization
Seismic Services
Software
Stimulation
Subsea
Flow Assurance
Rigless Subsea Well Intervention
Landing String Services
Lift Systems
Surveillance
Well Testing
Additional Services
Reservoir Challenges

Print-friendly view E-mail this page Give us your feedback for Rigless Subsea Well Intervention


Rigless Subsea Well Intervention



Click to view
Rigless coiled tubing, electric line, or slickline–enabled intervention solution for subsea wells.


Rigless subsea well intervention is the technology and methodology of reentering a subsea well to perform through-tubing work without a MODU, enabling coiled tubing, slickline, or wireline operations. Schlumberger is introducing two complementary rigless subsea intervention methodologies. These methodologies, Open Water Wireline (OWWL) and the Spoolable Compliant Guide (SCG), use common well control equipment accessible from a single vessel to create a step change reduction in the cost of a subsea well intervention.

Customers can now have rigless well services access to their subsea wells in water depths to 3,000 m. The addition of coiled tubing services and extension of water depth capability to 3,000 m offer added value at costs that are essentially the same as those for OWWL services deployed in shallow water depths today.


Request more information about Rigless Subsea Well Intervention and other Schlumberger innovations.