LUKOIL-Nizhnevolzhskneft Achieves 82% NTG in 2.5-m-Thick Sweet Spot with PeriScope HD Service | SLB

LUKOIL-Nizhnevolzhskneft Achieves 82% NTG in 2.5-m-Thick Sweet Spot with PeriScope HD Service

Published: 02/02/2016

Blue hero texture

Place long horizontal section within thin reservoir

The 9 1/2-in horizontal section of Well P-120, an offshore extended-reach well LUKOIL-Nizhnevolzhskneft was drilling in the Korchagina field of the Caspian Sea, had to be placed within a reservoir with a gross vertical thickness of 4 to 6 m—thinner than any reservoir targeted by previous extended-reach wells in the project. The upper part of the reservoir was interbedded with high-density laminated intervals, the lower part gradually transitioned from shale to sand, and the sweet zone within the reservoir was only 2–2.5 m thick.

In addition, the 3,694-m long section had to be kept 5 m above the oil/water contact, which was very close to this targeted interval in the reservoir; a lack of vertical offset data in the drilling direction created great uncertainty about formation properties and structural dip; collision with nearby wells had to be avoided; and maximum dogleg severity was limited by the need for smooth completion operations. All these steering constraints made it challenging to achieve LUKOIL-Nizhnevolzhskneft's objective of maximizing both the NTG ratio and ROP.

Provide precise trajectory control

Schlumberger met the challenge by integrating many services and technologies to optimize drilling parameters and provide precise trajectory control. This successful placement was achieved using the PeriScope HD service with a PowerDrive Xceed RSS. The PeriScope HD service allowed proactive geosteering and provided valuable information about reservoir geometry and substructure to supplement real-time formation evaluation data acquired by the EcoScope service. Real-time easurements from the PeriScope HD and EcoScope services were transmitted to surface, where LUKOIL-Nizhnevolzhskneft and Schlumberger petrotechnical experts delivered real-time interpretation.

Image - LUKOIL-Nizhnevolzhskneft Achieves 82% NTG in 2.5-m-Thick Sweet Spot with PeriScope HD Service - Schlumberger utilized integrated technologies, including the PeriScope HD service, to optimize drilling parameters and provide precise trajectory control. The custom drilling approached helped LUKOIL-Nizhnevolzhskneft reach TD of the horizontal section 6 days ahead of AFE.
Schlumberger utilized integrated technologies, including the PeriScope HD service, to optimize drilling parameters and provide precise trajectory control. The custom drilling approached helped LUKOIL-Nizhnevolzhskneft reach TD of the horizontal section 6 days ahead of AFE.

The PowerDrive Xceed RSS was teamed with a Smith Bits MSi516 bit that included ONYX II cutters and was specially designed using the IDEAS integrated drillbit design platform. Real-time drillbit optimization system was used to maximize drilling efficiency and to improve overall performance based on statistical processing of offset drilling parameters and rock properties. It was the first commercial use of the DBOS OnTime real-time drillbit optimization system in Russia.

To address the need for smooth completions, a predrill wellbore stability study was conducted, and mud weight was defined. The M-I SWACO MEGADRIL oil-base drilling fluid system was selected because of its inherent lubricity and shale inhibition compared with water-base mud. The fluid system lowered the friction coefficients. Additionally, the low-end rheology allowed the equivalent circulating density (ECD) to be lowered while wellbore stability was maintained and cuttings removal was facilitated in the long horizontal section. These systems and services enabled a trouble-free drilling and smooth completion run.

Drill horizontal section in one run

The entire 3,694-m horizontal section was drilled in one run—6 days ahead of section AFE. This set world records for the longest PeriScope HD service geosteering run in any size hole and the longest 9 1/2-in section drilled in a single run by a PowerDrive Xceed RSS. ROP averaged 48 m/h, higher than any previous ROP in the Korchagina field project. Geosteering the wellbore using the PeriScope HD service achieved 86.7% reservoir exposure in the first 2,936 m of the run. At that point, the technical limit of the drillpipe made it necessary to discontinue geosteering for the final 800 m to keep torque levels under control. That lowered overall NTG to 82%, which still surpassed any previous NTG in the project.

The record-setting NTG and ROP were made possible by advanced joint engineering planned and the PeriScope HD service's detection of bed boundaries in time to avoid penetrating high-density intervals. Drilling through those intervals would have strongly deflected the BHA, forcing the directional driller to reduce ROP to remain in the drilling tunnel. LUKOIL-Nizhnevolzhskneft chose to use PeriScope HD service in several more complicated future wells in the Korchagina field.

Graphic: LUKOIL-Nizhnevolzhskneft Achieves 82% NTG in 2.5-m-Thick Sweet Spot with PeriScope HD Service
The BHA that included the PeriScope HD service allowed the operator to achieve a record overall NTG ratio of 82%.
Location
Russia, Europe, Offshore
Details

Challenge: Maximize reservoir exposure and ROP while placing long horizontal section of extended-reach well within thin reservoir

Solution:

  • Optimize drilling parameters and trajectory control using PowerDrive Xceed RSS and TeleScope high-speed telemetry-while-drilling services
  • Increase drilling efficiency using a PDC bit with ONYX II premium PDC cutters matched to RSS using the IDEAS integrated drillbit design platform and DBOS OnTime real-time drillbit optimization system
  • Ensure smooth completion with a predrill wellbore stability study, MEGADRIL oil-base drilling fluid system, and advanced petrophysics interpretation and geomechanics services
  • Maximize reservoir contact without crossing into the water zone by using PeriScope HD multilayer bed boundary detection service and EcoScope multifunction logging-while-drilling service

Results:

  • Drilled 3,694-m section in one run at average ROP of 48 m/h