Cost of Geothermal Power and Factors that Affect It

Published: 02/25/2004

Premium
Schlumberger Oilfield Services

This paper presents an analysis of the sensitivity of the cost of geothermal power to: (a) capital cost; (b) operations and maintenance (O&M) cost; (c) make-up well drilling cost; (d) resource characteristics (well productivity and its rate of decline); (e) development and operational options (installed plant capacity, number of years of make-up well drilling, and project life); and (f) macro-economic climate (interest and inflation rates). The power cost here  represents levelized cost (in US cents per kilowatt hour) over the project life, the capital cost being amortized over 30 years; any royalties, tax burden, or tax credit are ignored. A range of development sizes, from 5 to 150 MW, with 50 MW as the base case, is considered. The economy of scale in both capital cost and O&M cost, as well as the higher productivity decline rate due to increased installed capacity, are taken into account. The capital cost does not include transmission line cost or any unusually site-specific costs of regulatory compliance or environmental impact mitigation.

Power cost is sharply reduced if full generation capacity is maintained, by drilling make-up wells, for at least the first 10 years or so following plant start-up; however, continuing make-up well drilling beyond about 20 years does not reduce power cost any further. The minimum achievable power cost is insensitive to plant capacity; it is on the order of 3.4 US¢/kWh. There are significant opportunities to reduce power cost as site-specific experience is gained in resource management and power plant operation throughout the project life. Power cost is most sensitive to unit O&M cost followed by unit capital cost, interest rate and inflation rate in the decreasing order of sensitivity; it is relatively insensitive to well productivity, drilling cost per well and well productivity decline rate. The macro-economic climate has relatively minor impact on power cost. Operating small power plants beyond their typical amortization period of 30 years can substantially reduce power cost; this reduction is insignificant for plants of 50 MW or larger capacity. Power cost does not decline significantly with increasing plant capacity except in the unlikely situation of well productivity decline being insensitive to plant capacity. In the unusual situation of an absence of economy of scale, power cost increases with plant capacity, the minimum achievable level still being 3.4 US¢/kWh. In the very unlikely situation of both well productivity decline as well as unit capital and O&M costs being insensitive to plant capacity, the minimum achievable power cost would be on the order of 3.6 US¢/kWh. For a 50 MW power plant today, the levelized power cost would be in the range of 3.6 to 4.1 US¢/kWh.

To request abstracts or topics from previous years, please contact geothermexinfo@slb.com.

THIS ITEM IS PREMIUM CONTENT. TO ACCESS THE FULL CONTENT, SIGN IN OR REGISTER BELOW.
Sign in or register