Schlumberger

Video: Case Study: xBolt Service Saves 53 Hours of Survey Time

The xBolt accelerated drilling service enabled a switch between EM telemetry and high-speed mud pulse to avoid making a 23-hour trip to change the BHA for a different telemetry tool.

Related videos

Related services and products

 
Request More Information

Maximize Drilling Efficiency

xBolt Accelerated Drilling Service
The xBolt accelerated drilling service is designed to maximize drilling efficiency through robust reliability and high-speed communication rates, enabling operators to deliver wells faster while positioning the wellbore accurately within the reservoir. Visit xBolt Service page