Case Study: Proactive Well Monitoring Enables Trinity to Reestablish Production in Gas Lock Event

Close collaboration across teams and monitoring provided by LiftWatcher service results in costs savings of 84%

Challenge: Identify gas lock events in a timely manner and react proactively to reduce production losses and avoid adversely affecting the BHA’s integrity.

Solution: Use LiftWatcher real-time surveillance service to identify gas lock event, notify the location, and remotely support the required changes in frequency to stabilize the well.

Result:

  • Reduced costs 84% by avoiding logistical challenges of onsite troubleshooting and minimizing deferred production.
  • Completed troubleshooting in just 7 hours, 70% less than the time required forstandard troubleshooting processes.

Trinity encounters abnormal ESP operation

Gas lock events are common for ESPs when high volumes of gas are produced, and the impact of these events varies in severity depending on the downhole equipment installed, operating conditions, and operational challenges. Trinity Exploration & Production (Trinity) had several wells in a high-gas environment offshore Trinidad in the Trintes field. One well was shut down at 12:27 a.m. due to generator issues and was restarted at 3:27 a.m. At 11:00 a.m., the Artificial Lift Surveillance Center (ALSC) noted that the well intake pressure and motor temperature were building abnormally.

ALSC uses real-time LiftWatcher service capabilities to identify gas lock event

The conditions identified by the ALSC using the LiftWatcher service tend to affect production and BHA integrity due to the gas accumulated at the pump stages, which limits fluid entry and reduces fluid velocity in the annulus. Tubing pressure and discharge pressure readings confirmed that the well stopped producing to surface due to a gas lock event. To correct this, the frequency was increased to 35.5 Hz from 33.5 Hz, resulting in the reestablishment of production to surface. After reaching the expected intake pressure, the frequency was reduced back to 33.5 Hz to allow the well to stabilize at its normal operating intake pressure. All frequency changes were made remotely by the ALSC team, reducing HSE exposure and eliminating the logistical difficulties associated with mobilizing a team.

Production successfully reestablished after gas lock event

As a result of the good collaboration and teamwork between the ALSC, Trinity’s operations team, and Schlumberger engineering and field staff, the well regained production in just 7 hours. Trinity was also able to reduce the costs of this remedial operation by 84% by avoiding the logistical challenges of onsite troubleshooting and minimizing deferred production.


Download: Proactive Well Monitoring Enables Trinity to Reestablish Production in Gas Lock Event (0.21 MB PDF)

Related services and products

 
Request More Information

LiftWatcher Service Identifies Gas Lock Event

Proactive Well Monitoring Enables Trinity to Reestablish Production in Gas Lock Event
PrevNextZoom1 of 1

Lift IQ Production Life Cycle Management Service

Lift IQ Production Life Cycle Management Service
Real-time surveillance helps to prevent premature equipment failure, optimizes artificial lift systems, lowers operating costs, and increases well productivity. Visit Lift IQ Service page