Case Study: Metal-to-Metal Sealing Technology Solves Challenge of Installing 3,604-m Casing in Unstable Wellbore

Operator avoids costly casing misrun to execute well design of choice and saves an estimated 5 days of rig time, North Sea

Challenge: Minimize NPT while running 3,604 m [11,824 ft] of 9 5/8-in casing to surface in an unstable borehole in the Norwegian North Sea.

Solution: Install a liner in the openhole section and tie it back to surface using Metalmorphology metal-to-metal sealing and anchoring technology.

Result: Achieved the integrity of a full casing string to surface with all the advantages of running the lower section as a liner and zero NPT.

Unstable wellbore hindered installation of long casing string

A North Sea operator’s well design required 9 5/8-in casing to surface with metal-to-metal connections throughout. Wellbore instability was a common occurrence in the field, and the 3,604-m interval included 728 m [2,388 ft] of open hole that was likely to hinder access. Long, heavy casing strings require extremely high torque to rotate, making it difficult to ream with casing and increasing the likelihood of multiple attempts—interspersed with wiper trips—to run the casing string to depth.

To minimize rig time and optimize costs, the alternative was to install a shorter, lighter liner across the unstable openhole section and tie it back to the wellhead with a separate tieback string. However, conventional liner equipment does not provide the metal-to-metal, gas-tight connection required.

Proprietary sealing technology enabled use of ream-down liner

Schlumberger proposed a liner system with a setting adapter and a metal-to-metal, gas-tight liner tieback system that uses Metalmorphology sealing and anchoring technology. This full-axial-load- bearing, V0 ISO 14310–certified system connects a liner to a tieback string of casing with a permanent, durable seal.

Operator achieved integrity of full casing string to surface with zero NPT

The proprietary technology enabled the operator to run the lower part of the casing as a liner on drillpipe, with all the advantages of push, pull, rotation, and circulation to address borehole restrictions and reach TD in one run. Subsequently, the tieback string was run in hole with the liner tieback system stinger on the bottom. The stinger was expanded into the tieback system receptacle at the top of the liner, achieving the required V0-rated, metal-to-metal downhole casing connection integrity.

Compared with running a long casing string to depth and assuming at least one wiper trip to recondition the hole during the process, the innovative Schlumberger system saved an estimated 5 days of rig time. The operator plans to use this system on other wells in the field.


Download: Metal-to-Metal Sealing Technology Solves Challenge of Installing 3,604-m Casing in Unstable Wellbore (0.13 MB PDF)

Related services and products

 
Request More Information

Metal-to-Metal, Gas-Tight Liner Tieback System for Connection Integrity

Metal-to-Metal Sealing Technology Solves Challenge of Installing 3,604-m Casing in Unstable Wellbore
PrevNextZoom1 of 1
“I’ve only heard good things from offshore and the job went very smoothly. We’re so satisfied with how things went on the well, we’d like to see if we can run the same solution again.”
Senior Drilling Engineer
Operating Company

Gas-Tight Solutions for Casing and Liners

Metal-to-Metal Casing and Liner Solutions
Learn more about our metal-to-metal solutions. Download brochure
(10.09 MB PDF)