Schlumberger

Case Study: geoVISION Imaging While Drilling Increases Liaohe Heavy Oil Production

Improved well placement, optimized cyclic steam stimulation in thin-layered reservoir results in 90% net to gross for PetroChina

Challenge: Improve well placement and cyclic steam flooding techniques to make heavy oil production economic in thin-layered, complex reservoir.

Solution: Integrate geoVISION imaging-while-drilling service and cyclic steam flooding procedures to optimize parameters for horizontal wells.

Result: Achieved average net to gross of more than 90%. Eliminated NPT. Increased production and income and reduced stimulation cost.

Improve heavy oil production in China

Vertical wells drilled in the Liaohe heavy oil reserve in northeastern China had proved uneconomic. So had horizontal wells drilled using traditional technology. Because the reservoir layers were thin—just 3 to 8 m—and the complex structure had many faults and formation dips, the horizontal wells often exited the target layer and had to be sidetracked, resulting in a poor net-to-gross ratio. To make production economic, PetroChina wanted to improve well placement and the cyclic steam flooding procedure used to extract the heavy oil.

Geosteer using imaging while drilling

An integrated solution enabled PetroChina to achieve its objective. Well placement in the complex structure was improved by using the geoVISION imaging-while-drilling service to guide steering decisions. Because the images were acquired near the bit and available in real time, the driller could avoid exiting the pay zone and having to sidetrack. This not only increased net to gross but also reduced cost and aided optimization of the cyclic steam flooding procedure and parameters.

Achieved 90% net to gross while eliminating NPT

Using geoVISION near-bit images to guide well placement resulted in more than 90% net to gross and zero NPT. This improved drilling performance, integrated with cyclic steam flooding optimization, increased production and income and reduced the stimulation cost per ton of oil. The income-to-input ratio at the end of the fourth year of the pilot project averaged 0.93—a significant improvement over the 0.03 ratio of the previous project. That improvement means the new wells will start to make a profit at the beginning of the fifth year. In the future, this proven integrated solution will enable PetroChina to economically develop the thinner heavy oil reserves in other oil fields of northeastern China.


Download: geoVISION Imaging While Drilling Increases Liaohe Heavy Oil Production (0.17 MB PDF)

Related services and products

 
 
 
Request More Information

Improving Well Placement to Optimize Steamflooding

geoVISION imaging enabled the driller to keep the wellbore in the pay zone to ultimately maximize production.Total income at the end of the fourth year of pilot project.
PrevNextZoom1 of 2