Performance Report: CLEANCUT ISO-PUMP Units Save Valuable Rig Downtime By Doubling as Temporary Mud Storage

Challenge: The operator required a contingency plan for the bulk storage of fluids and interfaces while carrying out well displacementsto and from oil-base mud. These measures would be used in the event that the rig storage pits were reaching their maximumcapacity and the Platform Supply Vessel (PSV) could not sit alongside the rig due to inclement weather. Onboard the rig were eight CLEANCUT ISO-PUMP units, which were used for temporary bulk storage of Oil-Base Mud (OBM) drill cuttings prior to them being transferred to the PSV for transportation to the onshore treatment plant. Utilizing the ISO-PUMP units for storage of fluid would, in theory, allow 760 bbl of oil-base mud/oily water to be stored safely before being transferred to the boat at a convenient time.

Solution: M-I SWACO, in conjunction with the rig owners and the operator, configured a system that would allow fluid to be transferred to the ISO-PUMP system for storage, and then back to the pits for transfer to the PSV. Fluid was transferred to the ISO-PUMP units from a designated pit using one of the rig’s centrifugal pumps. The fluid was routed to the ISO-PUMP system through an R-Valve and lines previouslyinstalled for the containment of drill cuttings. The fluid was then stored within the ISO-PUMP units until such time as the PSV could come alongside the rig for the fluid to be transferred. Prior to the fluid being off-loaded to the PSV, it was processed across one shaker, at a controlled rate, to ensure that any residual drill cuttings were removed. These cuttings were contained in skips for onshore treatment. With the CLEANCUT system already being installed on the rig, the use of ISO-PUMP units for temporary storage of fluids allowed OBM to be stored on the rig prior to the well being displaced. During the first well, adverse weather conditions were forecast, and it was decided to utilize the ISO-PUMP units for the storage 642 bbl of oil-base mud.

Result: M-I SWACO, in conjunction with the rig owners and the operator, configured a system that would allow fluid to be transferred to the ISO-PUMP system for storage, and then back to the pits for transfer to the PSV. Fluid was transferred to the ISO-PUMP units from a designated pit using one of the rig’s centrifugal pumps. The fluid was routed to the ISO-PUMP system through an R-Valve and lines previouslyinstalled for the containment of drill cuttings. The fluid was then stored within the ISO-PUMP units until such time as the PSV could come alongside the rig for the fluid to be transferred. Prior to the fluid being off-loaded to the PSV, it was processed across one shaker, at a controlled rate, to ensure that any residual drill cuttings were removed. These cuttings were contained in skips for onshore treatment. With the CLEANCUT system already being installed on the rig, the use of ISO-PUMP units for temporary storage of fluids allowed OBM to be stored on the rig prior to the well being displaced. During the first well, adverse weather conditions were forecast, and it was decided to utilize the ISO-PUMP units for the storage 642 bbl of oil-base mud.

Well Information
Location West of Shetland, UKCS
Rig Name: Paul B. Lloyd Junior
Spud: January 2004
Mud Type: Low-toxicity oil-base


Download: CLEANCUT ISO-PUMP Units Save Valuable Rig Downtime By Doubling as Temporary Mud Storage (0.49 MB PDF)

Related services and products

 
Contact Us
"The use of the ISO-PUMP system was a big success, allowing us to displace to OBM at a time when we would otherwise have been shut down due to adverse weather. The operator was more than pleased with the outcome.”
Angela Moore
Drilling Engineer