Case Study: Cobalt Saves 2.6 Days Using the 9 5/8-in CERTIS System for Deepwater Presalt Well Testing

The high-integrity reservoir test system successfully runs, sets, and retrieves the test string in a single run, saving time and costs, offshore Angola

Challenge: Minimize rig time and associated costs during deepwater presalt well test without sacrificing safety and quality.

Solution: Run the 9 5/8-in CERTIS high-integrity reservoir test isolation system that delivers productionlevel isolation in deepwater.

Result: Shortened the test duration 2.6 days by successfully running, setting, and retrieving the test string in a single run.

Minimize rig time during well test in presalt environment 

When operating a vertical oil well offshore Angola at 923-m water depth, Cobalt International Energy wanted to minimize rig time and associated costs during a deepwater presalt well test without sacrificing safety and quality. Cobalt also wanted to reduce rig time required to conduct the well test while ensuring the downhole tools were not damaged due to the operating environment. 

Run the Certis system for faster, lower-risk operations 

Schlumberger recommended Cobalt run the 9 5/8-in CERTIS high-integrity reservoir test isolation system that combines the elements of a retrievable packer with those of a hydraulic-set permanent packer, including a built-in floating seal assembly. This feature allows the test string to be run, set, and retrieved in a single run, eliminating unnecessary trips compared with permanent packers. The CERTIS isolation system is set without string rotation or mechanical movement for faster, lower-risk operations, which is especially critical in subsea environments. 

Achieved accurate data for reservoir characterization 

Cobalt successfully ran, set, and retrieved the test string in a single run, shortening the test duration by 2.6 days. Data from the memory gauges, run below the CERTIS system, were not affected by string movement due to temperature cooling effect and delivered highly accurate data for reservoir characterization.


Download: Cobalt Saves 2.6 Days Using the 9 5/8-in CERTIS System for Deepwater Presalt Well Testing (0.47 MB PDF)

Related services and products

 
Request More Information

High-Integrity Reservoir Test System Saves Time and Cost in Angola

The 9 5/8-in CERTIS high-integrity reservoir test isolation system.
PrevNextZoom1 of 1

Real-Time Downhole Testing with Wireless Telemetry

Quartet Downhole Reservoir Testing System Enabled by Muzic Wireless Telemetry
The Quartet downhole reservoir testing system combines four leading downhole tools in one shorter string—enabled by Muzic wireless telemetry.
Visit Quartet System page