Schlumberger

Brochure: Well Evaluation for Coalbed Methane: Logging solutions for optimizing field development

Date: 3/1/2009

Download: Well Evaluation for Coalbed Methane (2.29 MB PDF)

Maximizing the net present value (npv) from coalbed methane (CBM) production requires maximizing the reserves and rate of gas extraction while keeping costs down. Optimizing well design, placement, and completions, as well as stimulation and production, are key elements of this process. A successful project requires knowledge of the subsurface characteristics of the target CBM reservoir.

Related services and products

 
Request More Information