Schlumberger

Industry Article: Systematic Solution Overcomes Artificial Lift Challenges

Systematic solution overcomes artificial lift challenges
Publication: E&P
Publication Date: 04/01/2013

Operators in the liquid-rich portion of the Eagle Ford shale continue to search for the best means to optimize the long-term production after the natural flow stage ends. The challenge is to manage changes in production rate, define and manage reservoir deliverability from the stimulated reservoir volume, and increase production efficiencies. Electrical submersible pump (ESP) systems are used in the transitional artificial lift phase to provide an integrated program that maximizes production over the complete life of the well. The Eagle Ford shale play includes unique reservoir characteristics and fluid behaviors that are especially challenging in downhole conditions that include high temperatures, high gas volume, slugging, unsteady flow, paraffin, and some scale deposits that complicate artificial lift solutions. Magnum Hunter Resources and Schlumberger teamed up to implement an unconventional ESP solution as part of a systematic approach to transitional artificial lift.




Related services and products

 
 
 
 
 
Request More Information

REDA Maximus ESP Saves Workover and Rig Time

Electric submersible pump
The REDA Maximus ESP system uses exclusive MaxJoint flange connection technology for simpler and more reliable mechanical connections of motors and protectors. Visit REDA Maximus ESP System page