Schlumberger

Industry Article: Slim FPWD Saves 14 Rig Days

Publication: E&P
Publication Date: 07/01/2009

The new StethoScope 475 slimhole formation pressure-while-drilling (FPWD) system from Schlumberger successfully traversed five extended-reach slim boreholes in the Caspian Sea to obtain accurate and validated formation pressure measurements.



Download: Slim FPWD Saves 14 Rig Days (0.55 MB PDF)