Schlumberger

Industry Article: Canyon Express: Well Completions for Six High-Rate Deepwater Gas Producers

Downhole completion designs for six wells in two ultra-deepwater gas fields in the Gulf of Mexico Canyon Express project are discussed, including team planning, equipment details and successful use of the Discoverer Spirit drillship for the installation

Publication: World Oil
Publication Date: 07/01/2003

Subsea well completion design and implementation in Total’s (formally TotalFinaElf’s) Aconcagua field and Marathon Oil Co.’s Camden Hills field posed unprecedented challenges, Water depths in the area of planned development (up to 7,209 ft) were greater than for any well previously completed in the world. Limited gas reserves in this high-cost, deepwater environment precluded future economic intervention, so the completion design had to balance the potential complexity of multiple-zone production with high life-of well reliability.