Schlumberger

Industry Article: Horn River Kitimat LNG Terminal Entices Gas Producers

Horn River Kitimat LNG Terminal Entices Gas Producers
Publication: World Oil
Publication Date: 04/02/2012

The latest Horn River drilling program with Encana was highlighted in January with a world record for the longest single-bit run. In collaboration with Schlumberger, EnCana employed BHA design modeling and system integration to drill 17,250 ft in one run, comprising more than 297 drilling and circulating hours at a downhole temperature of 293°F. Schlumberger said the horizontal well included use of a Smith PDC bit, as well as an NBR-HR Power-Pak mud motor and a TeleScope MWD and Slider system.




Related services and products

 
 
 
Request More Information