Schlumberger

Tech Report: ACTive Matrix Service Achieves 100% Solubility of Hydrocarbon Deposits

Increased oil production enabled by complete wellbore cleanup and scale removal

ACTive Matrix Service Achieves 100% Solubility of Hydrocarbon Deposits

Publication Date: 03/02/2015

Petrozeit needed to dissolve the accumulated hydrocarbon deposits and clean up the wellbores in three wells located in the Ras El Ush field. The treatment included a perforation wash and matrix stimulation treatment, which used a mixture of solvents and acid that worked well with the perforation wash. By monitoring temperature, downhole parameters, and nodal analysis and skin evaluation measurements in real time, ongoing analysis could be conducted to ensure efficient placement of the treatment.




Related services and products

 
Request More Information

Real-Time Measurements Improve Downhole Treatment Quality

ACTive Real-Time Downhole Coiled Tubing Services
ACTive Matrix CT real-time stimulation and conformance service provides optimized matrix stimulation to improve production in naturally fractured carbonate reservoirs.
Visit ACTive Matrix Service page