OMV needed to conduct rigless multistage hydraulic fracturing for a total of 11 zones in two horizontal wells. However, high bottomhole static temperatures and extended laterals posed major challenges for plug-and-perf operations; the high temperatures limited the use of tractors, which were rated to only 350 degF [177 degC].

After running several simulations, Schlumberger recommended the Vantage modular CT logging head system modified for high temperature (400 degF [204 degC]) by incorporating high-temperature seals throughout the tool. Using the Vantage system, ASFS system, and e-line coiled tubing, OMV was able to set plugs, pressure test the plugs, and perforate two different depths in the same run. OMV successfully executed 10 plug-and-perf runs in just 14 days without any NPT in the first well, saving USD 760,000 in additional runs in the second well.




Related services and products

 
 
 
Request More Information

Deploy Rapidly and Save Rig Time

Vantage Modular CT Logging Head System
The Vantage modular CT logging head system's versatile design allows long string deployments, and multiple runs without change-outs.
Visit Vantage System page