Schlumberger

Tech Report: Kuwait Oil Company Recovers Curve and Increases ROP by 45% with Fully Rotating RSS

PowerDrive Orbit RSS builds at 5º/30 m despite heavy mud weight

Kuwait Oil Company Recovers Curve and Increases ROP by 45% with Fully Rotating RSS

Publication Date: 07/07/2015

Kuwait Oil Company was drilling in an environment with hard limestone and a heavy-mud-weight requirement and needed to recover a curve after third-party rotary steerable systems failed to achieve the 4.5°/30-m [4.5°/100-ft] build rate required.




Related services and products

 
Request More Information

Specially Engineered RSS Drills in Any Environment

PowerDrive Orbit Rotary Steerable System
A push-the-bit rotary steerable system with improved drilling performance and precise wellbore positioning.
Visit PowerDrive Orbit System page