Schlumberger

Tech Report: PowerDrive Orbit vorteX RSS Helps Drill Basin's Longest Single-Run 8.5-in Section

Combined technologies drill first extended-reach lateral for Eclipse Resources in the Utica Shale

PowerDrive Orbit vorteX RSS Helps Drill World's Longest Single-Run 8.5-in Section

Publication Date: 09/23/2016

The entire 18,752-ft lateral was completed in one run as planned, with total drilling time at 157.71 hours and with low tortuosity delivered by an HIA automated steering algorithm. The TelePacer MWD platform helped to keep in-zone percentage at 95% in the drilling target window and 100% in the geologic window.




Related services and products

 
 
Request More Information

Specially Engineered RSS Drills in Any Environment

PowerDrive Orbit Rotary Steerable System
A push-the-bit rotary steerable system with improved drilling performance and precise wellbore positioning.
Visit PowerDrive Orbit System page