Schlumberger

Tech Report: ROP Optimization and RSS Technologies Increase ROP 70% and 143% in Penglai Field with No NPT

Optimized BHA drills 764-m interval in 24 hours, setting field record

PowerDrive

Publication Date: 09/05/2014

In its drilling operation in the Penglai field, China, an operator was faced with long connection times and a plateau in drilling performance. To increase efficiency and drilling performance, the operator needed to increase ROP and establish new connection practices that would reduce connection time.




Related services and products

 
 
Request More Information

Powered RSS Provides Additional Torque for High ROP

PowerDrive VorteX
Maximum torque capacity provides the PowerDrive vorteX powered RSS with more weight on bit for increased ROP.
Visit PowerDrive VorteX system page