Tech Report: Operator Mills 20-ft Window, Drills 10-ft Rathole in One Run with TrackMaster Elite System

Completion system passes through window and well begins production

Operator Mills 20-ft Window, Drills 10-ft Rathole  in One Run with TrackMaster Elite System

Publication Date: 02/18/2016

After losing a directional drilling assembly below 9 5/8-in casing, the operator required a cased-hole sidetrack to maneuver around the lost BHA components and drill the well to TD.