Schlumberger

Tech Report: Reactive Shale Stabilized by FAZEPRO and FAZEBREAK Systems to Exceed Production Expections by >52%

Technologies enable production from Kuwait’s first dual-lateral well completed with ICDs and swellable packers

FLOPRO NT Fluid Prevents Formation Damage While Drilling Challenging Slavetskoye Field Wells

Publication Date: 09/30/2016

An operator was drilling the horizontal section of Kuwait’s first dual-lateral well completed with inflow control devices (ICDs) and swellable packers. Due to reactive shale in the formation, the operator needed a nonaqueous drilling fluid. In addition, this new type of completion required a filtercake that could be removed without harsh acids or damaging solvent treatments.




Related services and products

 
 
 
Request More Information