Tech Report: FAZEPRO and FAZEBREAK Systems Help Operator Exceed Production Expectations by More Than 20%

Operator uses drill-in fluid and filtercake breaker to successfully drill and complete three horizontal wells in challenging, reactive shale layers

FAZEPRO and FAZEBREAK Systems Help Operator Exceed Production Expectations by More Than 20%

Publication Date: 11/14/2016

An operator planned to complete the 8 1/2-in horizontal section of three wells with inflow control devices (ICD) and swellable packers. Based on previous experience, a nonaqueous reservoir drill-in fluid (RDF) was requested to control reactive shale layers found in the sand reservoir. To avoid potential damage to the completions, the operator also sought a filtercake breaker with a low corrosion rate.

The operator used a PowerDrive RSS and the PeriScope HD service to geosteer the 8 1/2-in sections—drilling at an average ROP of 25–30 ft/h. Using offset well data in OPTIBRIDGE software, M-I SWACO optimized the bridging particles in the FAZEPRO system for a thin, impermeable filtercake. The FAZEBREAK system cleaned up the wells while maintaining the integrity of the sand control screens. Oil production from the three horizontal wells exceeded operator targets by 20–25%.




Related services and products

 
 
 
 
 
 
Request More Information
M-I SWACO logo

FAZEPRO

FAZEPRO fluid combines the drilling advantages of both invert emulsion and water-base systems.