Tech Report: Technical Domain Support and ResFlow ICDs Increase Production 16% in the Gulf of Thailand

Water breakthrough delayed by 50 days and sweep efficiency improved

Technical Domain Support and ResFlow ICDs Increase Production 16% in the Gulf of Thailand

Publication Date: 07/20/2015

An oil field offshore Thailand is characterized by complex reservoir geometries (comprising multiple sand pockets with intermittent shale) and broad heterogeneity. Relatively-higher-mobility water encroaching on viscous oil, combined with strong, active aquifer support, was causing early water breakthrough in horizontal wells, sometimes within days of commencing production. In some wells, the water cut increased exponentially, leading to oil recovery of less than 10%. 

Choking the rate of production at surface to control water cut impacted production targets negatively, and downhole treatment was not a viable option because it could cause formation damage. Inflow control devices (ICDs) were proposed as a potential solution for Well A. The performance of this well would be compared with the offset Well B completed in the same sand using conventional stand-alone screens.

ResFlow ICDs optimize production by balancing reservoir inflow along the length of the wellbore. Well A delayed water production by nearly two months and produced an additional 75,500 bbl of oil over 2.5 years compared with Well B, despite a shorter net sand interval (600 ft versus 1,000 ft).




Related services and products

 
Request More Information

Minimize Effects of Water and Gas Breakthrough

Inflow Control Device
ResFlow inflow control and ResInject injection control devices help maintain uniform inflow and injection rates, respectively, in openhole completions. Visit Inflow Control Devices page