Schlumberger

Technical Paper: Integrating Technology for Improving Recovery and Field Redevelopment in a Highly Heterogeneous Carbonate Reservoir

Society: SPE
Paper Number: 168172
Presentation Date: 2014
 Download: Integrating Technology for Improving Recovery and Field Redevelopment in a Highly Heterogeneous Carbonate Reservoir (4.73 MB PDF) Login | Register

 

Abstract

Field XYZ located in the western offshore India is a multi-pay, multi-layered heterogeneous Carbonate reservoir having lateral discontinuities. Discontinuous layers and scale deposition and near well bore damage have led to multi-dimensional problems related to both upper and lower completions reducing ultimate field recovery. Workover attempts like re-perforation, additional perforations and plugging, artificial lift by electrical submersible pump (ESP) and secondary recovery by water injection were implemented to maximize the field recovery. However, any work over had only short term impact on production increase and water injection and ESP performance were inefficient. Production History showed cyclic decline in production with time. Identifying and locating the layers’ discontinuities became crucial in candidate selection and design of efficient injection pattern, artificial lift, completion and work over in existing and new infill wells.

The following case study presents a workflow involving multi well geological, petro physical and time lapse formation pressure data and production logs to identify and locate lateral discontinuity within a pay of the field. The reservoir pressure support attempts using water injection methods were proved to be inefficient. Furthermore, this workflow has been successfully implemented for candidate well selection and designs the artificial lift using ESP.

An effective ESP design for three wells was implemented and seven future candidates for ESP were recognized. Additionally, locations of three new infill wells are identified and a strategic layer wise completion was designed. Implementation of the results increased production from the field by 27%.

Related services and products

 
 
Request More Information

Expert Services to Optimize Production Performance

Production Engineering & Consulting Services
Integrated services that incorporate multidisciplinary input to reveal reservoir potential and direct recovery strategies. Visit Production Engineering & Consulting Services page