Technical Paper: Ceiba Completion Optimization: A Fast-Track Approach to Success

Society: SPE
Paper Number: 77434
Presentation Date: 2002
 Download: Ceiba Completion Optimization: A Fast-Track Approach to Success (0.85 MB PDF) Login | Register

 

Abstract

Triton Energy Ltd. (Triton) (acquired by Amerada Hess Corporation in August 2001) and Energy Africa (15% WI), set a benchmark for the oil industry by discovering and developing a deepwater Equatorial Guinea, West Africa field and establishing production to a FPSO in less than 14 months. The fast-track development project operated by Triton commenced in October 1999 following the Ceiba-2 confirmation well. The completion strategy and its success played a major role in realizing this world record achievement and continually improving well performance in the Ceiba field 1.

As with any new field, development of the optimum completion strategy evolved based on lessons learned. Eight (8) producers, one (1) sidetrack and three (3) water injection wells have been completed to-date. The initial five (5) production wells (Phase I), utilized cased-hole completions. Four of these five wells employed single-trip perforating and gravel pack (STPGP) completion techniques. These completions produced upwards of 18,000 bopd with moderate skins. The fifth cased hole production well was completed using a single-trip perforating, gravel pack technique in conjunction with a hydraulic fracture treatment (STPFP). This resulted in an improved skin factor and Productivity Index (PI). The remaining three (3) producers were completed as open hole gravel packs using mineral oil based mud (MOBM) as the reservoir drill-in fluid (RDF). Three seawater injection wells have also been completed to date. Two (2) were performed as STPGP's and one (1) as a STPFP. These recent changes of methodology have proven successful in further enhancing productivity index and reducing skins.

The versatility and flexibility required to successfully incorporate the required strategy changes in such a short time frame, reflects the weighted risk taking approach and aggressive management style of the operating company and a strong commitment of the service sector.

Major Contributors to Project Success:

  • Development of strategies to allow flexibility and overcome supply, logistical and operational constraints associated with remote operations
  • Optimization of completion techniques and equipment
  • Successful utilization of a single trip perforating/gravel pack system for wells with world class, high permeability intervals
  • Successful utilization of a single-trip perforating and screen running technique in conjunction with a Frac-Pack treatment
  • Development of strategies to address issues, problems and results associated with transitioning from a single trip perforating and gravel pack to open-hole gravel pack completion
  • Development of strategies to address issues, problems and results associated with testing wells at rates in excess of 11,500 BOPD to floaters.