Print

Multistage Stimulation Systems

Multiple stages in a single continuous operation

Schlumberger multistage stimulation systems are designed to fracture and stimulate multiple stages in a single continuous operation. These systems—cemented and uncemented—can be used in vertical, deviated, and horizontal wells.

573 Copperhead Drillable Bridge and Flow-through Frac Plugs Set and Removed with 99% Success Rate

The operator minimized the costly downtime that commonly results from presetting and failure when frac plugs are subjected to multiple pressure reversals. Read case study

Uncemented Multistage Stimulation System

Cemented Multistage Stimulation System

ELEMENTAL Degradable Technology

Enhance multistage stimulation operations by using frac balls engineered with the patented ELEMENTAL degradable technology. The degradable material eliminates the need for mechanical removal of stuck balls, ensuring that production reaches its full potential.

Frac Plugs

Related services and products

 
 
Request More Information

KickStart Valve Wins Award
for Engineering Innovation

E&P MEA Medal
The KickStart rupture disc valve eliminates an intervention to perforate the first stage of plug-and-perf operations, providing a more efficient way to start the fracturing process.
Visit KickStart Valve page

Isolate and Stimulate Multiple Zones Continuously

Falcon System
The Falcon multistage stimulation system for uncemented wells stimulates many stages in sequence, minimizing downhole trips, reducing downtime between stages, and lowering the amount of fluids and proppant needed. Visit Falcon System page