Print

Lost Circulation Solutions

Bridge thief zones that can lead to lost circulation while drilling and cementing

Uncontrolled loss can propagate damage deep into the reservoir, impacting an operation’s budget and works schedule. Schlumberger provides effective, customized solutions that mitigate loss of drilling fluid to help you avoid stuck pipe, mud losses, and remedial work. We offer loss circulation solutions suitable for a wide range of environments including natural fractures, dolomite and carbonate zones, rubble zones, depleted reservoirs, and reservoirs with known lost circulation issues.

Cure lost circulation and reduce drilling costs

Fluid loss into a naturally fractured rock requires a different treatment than loss into porous or vuggy formations, and treatment techniques can be limited by wellbore temperatures and application times. We develop an understanding of your reservoir formation and identify the type and cause of the lost circulation problem in order to offer a permanent or temporary solution that will fit into the life cycle of your well.

Losseal Family of Reinforced Composite Mat Pills

CemNET Fiber Technology

PressureNET Fiber- and Solids-Based Lost Circulation Solution

Request More Information

Degradable Fiber Pill for Lost Circulation in Fractured Reservoir Sections

Losseal Lost Circulation Treatment System
A novel degradable solution was successfully proven during field trials in various drilling scenarios ranging from severe to total losses with effective loss mitigation. Read technical paper