Offshore Early Production Systems

Track record since 1993

Year Country Capacity (bbl/d oil) Export System Features/Remarks
Jackets/Platforms
1998 Congo 10,000 Pipeline Temporary plant
Jackups
1996 Qatar 40,000 Pipeline
1996 Nigeria 50,000 Tanker Conversion of jackup rig into floating production facility
1995 Nigeria 40,000 Pipeline Conversion of jackup rig into floating production facility
1995 Norway 50,000 Pipeline Water injection and gas compression
1994 Qatar 20,000 Tanker
Semisubmersibles
2000 Brazil 120,000 Pipeline Debottlenecking project
2000 South Africa 10,000 Shuttle tanker Tie in to existing system
1997 South Africa 25,000 Shuttle tanker Subsea wellheads, water injection
1995 UK 35,000 Extended well test
1995 UK 26,000 Extended well test
1995 UK 30,000 Sea line/tanker Water treatment and injection
1994 UK 35,000 Sea line/tanker Extended well test
1993 Brazil 10,000 Sea line/tanker Subsea wellheads, water injection
Floating Production, Storage, and Offloading (FPSO) Vessels
1998 Australia 60,000 Tanker Gas lift, water treatment
1997 Malaysia 20,000 Tanker Spread-moored tanker
Other Vessels
1999 USA 18,000 Tanker Installation of extended well test facility on drillship
1997 Mexico 10,000 Pipeline Test and storage boat