Schlumberger

Haynesville-Bossier Shale, TX-LA-MS Basins

Date Published Title Category
Sep 2013 New Downhole Components Meet Needs for Extreme High Temperatures Industry Article
Apr 2013 Horizontal Multistage Pumping System Provides Natural Gas Liquids Solution Industry Article 
Apr 2013 Seismic-Based Heterogeneous Earth Model Improves Mapping Reservoir Quality and Completion Quality in Tight Shales Technical Paper
Jan 2013 Haynesville Operator Cuts Proppant Consumption 47%, Horsepower 16%, and Water Usage 26% Case Study
Jan 2013 Hidden Fault Detection in Haynesville Shale Prevent Losses of 33% Gas Production Case Study
Nov 2012 Multi-Well Walkaway-VSP to Resolve Structural Uncertainty in the Haynesville Shale Play Technical Paper
Oct 2012 Next-Generation Spear Bit Drills Haynesville Shale 19% Faster Case Study
Jul 2012

Refinements to Cutter Technology and PDC Bit Hydraulics Lead to Faster Drilling in Hard/Abrasive Formations, East Texas

Technical Paper
Apr 2012 Bits Increase ROP, Eliminate Trips Industry Article
Apr 2012 ONYX II Cutter Technology Saves East Texas Basin Operator USD 250,600 Case Study
Nov 2011 Understanding Gas Production Mechanism and Effectiveness of Well Stimulation in the Haynesville Shale Through Reservoir Stimulation Technical Paper
Feb 2011 Spear Drill Bit Saves USD 365,000 in Haynesville Shale Well Case Study
Jun 2011 Peerless Performance Industry Article
Oct 2010

Understanding Gas Production Mechanism and Effectiveness of Well Stimulation in the Haynesville Shale Through Reservoir Simulation

Technical Paper

Request More Information