Schlumberger

Completing Shale Plays

Achieve more reservoir contact

Shale reservoir completion techniques for achieving maximum reservoir contact vary from play to play, in different areas within a single play, and even along a single lateral. Choosing the best design can have a measurable impact on economic results. Optimizing completions also reduces environmental impact.

Completion Integrity & Methods

Stimulation Modeling

Fracturing Shales

Measuring Completions Effectiveness

Related services and products

 
 
 
 
 
 
Request More Information

Achieve Higher Productivity in Vertical and Horizontal Wells

HiWAY Flow-Channel Fracturing Technique
HiWAY flow-channel hydraulic fracturing technique is helping operators increase fracture conductivity and production while using less water and proppant.
Visit HiWAY Technique page

CAMShale Fracturing Fluid Delivery and Flowback Service

CAMSHALE completions flow control technology
With Cameron now part of Schlumberger, benefit from seamless delivery of hydraulic fracturing fluid to flowback with a single point of contact and all OEM equipment.
Visit CAMShale Service page on the Cameron website