Schlumberger

Pressure Deployment CT System

Overview Library

Optimized equipment for executing long-BHA operations

The pressure deployment CT system facilitates safer, more efficient running of BHA strings that are too long to be lubricated in the wellhead stack. The system combines several equipment innovations to surpass the capabilities of traditional bar deployment, circumventing stack height limitations while running long BHAs.

Deploying a Long BHA Saves Runs

The pressure deployment CT system eliminated two perforating runs while maintaining dual well control barriers for an operation in Alaska.
Read tech report


In contrast with traditional pressure deployment systems that have focused on long perforating strings, this system has the flexibility to deploy other long BHA types as well, including smart-CT applications and the ACTive real-time downhole coiled tubing services portfolio.

Related services and products

 
 
 
Request More Information

Pressure Deployment CT System Optimizes Long-BHA Operations

Pressure Deployment CT System
PrevNextZoom1 of 1