Through-Tubing Sidetracking

TrackMaster TT Through-Tubing Whipstock System

For exiting standard steel casing below the production tubing or some other restriction where a 3- to 15-ft rathole is required, the TrackMaster TT through-tubing whipstock system has lead and mill follow designs for consistent and fast milling performance.

The system features a unique geometry that compensates for the relative size difference between the whipstock and casing diameters, and its hydraulically actuated expandable anchor spans multiple sizes and weights.

For added security, the TrackMaster TT system has an antirotational, high-axial-load slip design as well as a hydraulically activated kickover hinge that positions and stabilizes the whipstock.

Request More Information