REDA ESP System Cables
High-integrity power cables
Choose customizable ESP cables for specific downhole conditions, including high-temperature, gassy, and corrosive wells.
Deploy an electric submersible pump (ESP) using standard coiled tubing—eliminating the need for a workover rig and surface equipment—using the REDA Coil coiled tubing (CT)-deployed ESP system. This simplified deployment method is especially beneficial in offshore and deepwater applications, where moving a rig onsite increases costs and delays production.
In the REDA Coil ESP system, fluid flows through the large annulus either between the coiled tubing and permanent production string into which the ESP is deployed or—when no permanent production string is required by the operator—between the coiled tubing and casing.
The REDA Coil ESP system consists of a length of coiled tubing with a preinstalled ESP power cable. An inverted system positions the motor at the top and the pump at the bottom. At the surface, the coiled tubing is made up to a coiled tubing hanger that is landed in the wellhead. This configuration enables the ESP to be run and retrieved without removal of the production tree or flowlines—and without a rig. The ESP cable is terminated to a wellhead penetrator for connection to a surface cable.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup