- Characterization
- Drilling
- Completions
- Production
- Intervention
- Insights
- Resource Library
- Locations
- Software
Field-proven in dual-tubing completions, the Manara production and reservoir management system improves resource recovery with real-time flow monitoring and control of each zone of your well without intervention.
Whether you commingle the produced fluids or keep them separate with a dual-tubing completion, Manara system helps you gain deeper understanding of your reservoir, enabling real-time flow control changes to maximize reservoir recovery for each zone—even if pressures and fluid properties are significantly different.
Manara system intelligence improves zonal performance by measuring flow and enabling you to manipulate chokes to maintain optimal performance over time with dynamic changes in the reservoir behavior—all in real time, without any interventions such as production logging. The real-time flow data also helps you manage artificial lift, such as gas lift systems, to optimize recovery.
Because Manara system operates electrically, it simplifies your completion by eliminating the many control lines required in conventional hydraulically operated systems. That leaves more room in the wellbore for fullbore commingled production or dual-tubing completions that ensure compliance with allocation reporting.
The technology makes it easy to delay water or gas breakthrough near the heel—common in longer multizone wells—and thereby maintain or even improve production from the deeper zones you invested time and money to reach. The overall effect is improved recovery across the whole well, with real-time control of each zone.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup