Video Rapid Multilateral Systems | Video
Access reserves without additional infrastructure
The RapidTieBack TAML 3 or 4 conventional multilateral junction simplifies multistage stimulation and repeatable selective entry in multilateral wells. The proven installation procedures, fully stackable system design, and high hanging capacity make it an efficient option for maximizing reservoir contact with minimal location footprint on shore or offshore.
Simple and cost-effective, the RapidTieBack multilateral junction provides a solution that is compatible with many completion options, including cemented or uncemented laterals, plug-and-perf systems, and hydraulic multistage fracturing.
The RapidTieBack junction uses the lateral locator insert (LLI) to anchor the liner and act as a depth and orientation marker. The LLI has a hanging capacity of 150,000 lbm [68,039 kg] and a torque capacity of 12,000 ft.lbf [16,270 N.m].
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup