Manara
Electric production and reservoir management system
Optimize recovery by monitoring and controlling flow from many zones and compartments in real time, even in multilateral wells.
The modular selective lateral intervention completion (SLIC) system enables through-tubing intervention in multilateral wells. It can be used to access the lateral or to hydraulically isolate the lateral from the main bore.
Multiple modules can be installed for selective intervention access with a wellbore has multiple laterals.
Each SLIC system module is a tubular with a side opening, sealbores, and profiles for intervention tools. It uses standard tubing threads and is run into the well as part of the completion string.
Three intervention tools are available with the system:
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup