Tech Report On-Rig Treatment of Cuttings for Discharge Recovers USD 340,000 Fluid for Reuse
2,968 tonUK of oil-based cuttings treated on the rig and discharged at <0.1% TPH
Formation drilled cuttings can be handled by various methods, depending largely on environmental requirements, geographic location, and geological conditions. Cuttings must be transported and prepared prior to final disposition, which may include reinjection into subsurface formations.
Optimal drilling waste management demands high performance in surface and subsurface engineering analysis and unparalleled diagnostic expertise—before, during, and after the operation.
Drilling Waste Management Offerings
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup