Tech Paper Successful High-Density Cement Plugs in an HP/HT Presalt Deepwater Well in Brazil’s Santos Basin
WARP fluid technology successfully isolates deep, overpressured presalt gas reservoir.
CemCADE cementing design and evaluation software aids in designing and optimizing various cementing job parameters. This integrated software is applicable for all primary land or offshore cementing operations, from large-diameter surface casing to the deepest liners. It can also optimize plug placement.
CemCADE software ensures well security at all times during cementing jobs. It optimizes pipe standoff and helps calculate optimal displacement of mud and preflushes (mud removal and cement placement) to reduce the risks of channeling and microannulus (zonal isolation).
Actual job execution data can be imported into CemCADE software to compare design with actual results to verify the success of the operation. SynCBL can be used to simulate the CBL response based on execution job data. This response is compared with the actual CBL data, and interpretation of the cement logs is performed.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup