- Characterization
- Drilling
- Completions
- Production
- Intervention
- Insights
- Resource Library
- Locations
- Software
People, technologies, and services that deliver real value for UAE operators.
Allegro CD service eliminates NPT and saves >4 d, offshore Dubai.
A major operator was concerned about stuck pipe in an extended-reach well in which a costly BHA was installed.
This paper discusses the successful execution of high temperature water-based system in one of high-temperature well in ADNOC field.
This paper demonstrates a viable solution that can be successfully applied to reduce or eliminate such induced losses during the cement job.
This paper describes the successful design and execution of an engineered flexible-expanding cement system to overcome various challenges including long salt formations, potential high-pressure zones and lost circulation zones.
This paper describes the treatment applied to improve the integrity of the Limestone formation while drilling through induced losses in extended reach wells in the UAE offshore field.
This paper demonstrates continuous improvements in the prevailing step-wise approach and the role of the improvements in attaining needed zonal isolation.
This paper aims to discuss the challenges encountered while cementing these extended reach wells, especially across the 9 5/8-in casing in 12 1/4-in openhole, and evolution of the cementing process while overcoming those challenges.
Hardware and services that meet objectives, from pore to pipeline, in UAE
Optimize drilling in any formation with bits incorporating specialty element designs.
Enhanced rheological profile and fluid loss control with low sag tendency.
Enhance hydrocarbon production through an established filtercake to eliminate the need for a chemical breaker.
Improve well integrity and minimize NPT by plugging large voids and fractures.
Suit a variety of downhole conditions with customized spacer chemistry.
Expedite processing and interpretation up to 10× faster than conventional methods.
In 1950, Schlumberger engineers performed their first log in the United Arab Emirates at the Ras Sadr-1 well. We are proud of our shared history with the UAE and our strong commitment to the UAE In-Country Value. We remain dedicated to investing in the country and developing fit-for-purpose technologies tailored to address UAE's reservoir challenges and unlock its full potential.
The main focus is on
Schlumberger Middle East S.A.
28th Floor, Sky Tower, Al Reem Island
PO Box 21, Abu Dubai, UAE
+971 2 610 1200
Fax: +971 2 634 9415
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup