Case Study Saturn Radial Probe Collects Fluid and Measures Pressure at 0.05-mD/cP Mobility in 6-in Caspian Sea Well
Oil samples and extended buildup in only 4.5-h total time on station in subsalt carbonate reservoir saves rig time and mitigates operational risk.