Advanced system delivered on time and on budget
The proposal was accepted and resulted in doubling of the award to a
total of 20 thermal liner hanger systems. Work commenced without delay to meet
the 3-month deadline for the first system. Engineering and manufacturing files
were developed locally, a dedicated manufacturing and quality engineer
assigned, raw materials ordered, specialized equipment sourced, and components
manufactured and assembled under expert supervision to form an integrated
system, which subsequently passed the stringent Schlumberger qualification
process.