Tech Report: Single Run with PowerDrive X6 RSS and PeriScope HD Service Places Lateral in Thin Kazakhstan Reservoir

Bed boundary and RSS geosteering services thread treacherous interval measuring as thin as 0.5 m, onshore

Single Run with PowerDrive X6 RSS and PeriScope HD Service Places Lateral in Thin Kazakhstan Reservoir

Publication Date: 05/17/2019

JV Kazgermunai, LLP planned to drill a horizontal section to access a thin reservoir. However, there was uncertainty as to the exact position of the reservoir layers within the formation and their lateral continuity. Consequently, the company needed to ascertain better positioning of the target reservoirs, confirm the lateral extent of these intervals, and place the maximum length of the lateral inside the reservoir layer(s) while minimizing the risk of exiting the reservoir bottom.




Related services and products

 
 
Request More Information