Integrated Well Abandonment | Engineer | Schlumberger

Engineer

Streamline job design

Well designs across a field may have initially followed a similar template, but differences during construction and the production life leave each well requiring its own individual abandonment plan aligned within the broader campaign strategy.

Schlumberger ensures you start with the most up-to-date information possible. We review the data acquired during a well’s lifecycle with the latest evaluation tools, performing dynamic modeling and simulation, and subsurface studies where required—all to engineer the optimal project design.

Well site data information room.

Share This