Maintain proppant pack integrity in hydraulic fractures to maximize near-wellbore conductivity and oil and gas production.
Treatment Reduces ESP Failure Rate
地点
Indonesia, 亚洲, 陆上
总结
Challenge: Scale buildup and unexpected proppant flowback account for 73% of ESP failures.
Solution: SLB designed a single stage treatment that integrates ScaleFRAC scale inhibitor service and PropNET hydraulic fracturing proppant flowback control technology.
Results: Uninterrupted production for more than 9 months after scale and proppant flowback solution.
目标
结果
Well workover required after 3 months production prior to SLB solution. Uninterrupted production for more than 9 months after scale and proppant flowback solution.
相关产品