Turbodrilling deviated interval saves PEMEX 96 hours
SLB reduced the number of days, runs, and bits required to drill in 8½ in interval in Cretaceous formation with a high percentage of abrasive chart nodules. We used 6⅝ in Neyrfor turbodrilling system with 8½-in Kinetic diamond-impregnated bits.
Drill through abrasive Cretaceous formation
PEMEX was drilling the 8½-in intervals of onshore wells in the Terra field near Villahermosa, Mexico, with positive displacement motors (PDMs) and rock and PDC bits. Because the Cretaceous formationwhich was mainly compressible mudstone with up to 40% abrasive chert nodulescaused rapid wear of BHA components, multiple runs and many days were required to drill each interval. PEMEX wanted to reduce drilling time for the interval and the number of bits used.
Introduce turbodrilling system with diamond-impregnated bits in Mexico
SLB drilled to TD in less than 211 hours at an average ROP of nearly 7 ft/h and saved 96 hours bringing well to production.
The SLB Integrated Project Management (IPM) team, working with PEMEX, introduced the 6⅝-in Neyrfor turbodrilling system with 8½-in Kinetic diamond-impregnated bits in Mexico to replace the PDM system and rock bits. The directional turbodrill was configured with two integral body stabilizers, which were augmented with a string stabilizer.
During the first turbodrill run, the directional plan called for building angle, and the a KHi913 hybrid Kinetic bit with PDC cutters were used. Later, the turbodrill was run with a K503QTB Kinetic bit designed for superior performance at high rotary speeds in tough, abrasive formations.

Saved 96 hours of drilling time
Using the Neyrfor turbodrill and customized Kinetic bits, the directional driller successfully built angle to 28° and reached interval TD in less than 211 hours at an average ROP of nearly 7 ft/h. The time to drill to TD was approximately 96 hours less than the time required to drill the interval in offset wells with conventional drilling systems. Reducing the drilling time enabled PEMEX to put the well into production sooner.

