Integrated Well Construction Achieves Record Performance in Middle Eastern Field
已发表: 03/17/2021
Integrated Well Construction Achieves Record Performance in Middle Eastern Field
已发表: 03/17/2021
By integrating well construction technologies, an operator drilled an entire well in 26.2 days, which was a 5.5% improvement over the previous field record. The 121/4-in section was the fastest drilled in the field, surpassing the previous record by 20%.
地点
Middle East, 亚洲, 陆上
背景
In a multiwell, multiyear lump-sum turnkey (LSTK) project where the drilling environment is a constant challenge, the LSTK business model aims to reduce well time and costs by integrating well engineering and fit-for-purpose technologies.