Managed pressure drilling solution overcomes formation overpressure in Ruwais field

minus
Middle East, 阿拉伯联合酋长国, 陆上

Using proven SLB managed pressure drilling (MPD) technology, a major operator reliably and efficiently drilled an exploratory gas well in Abu Dhabi’s Ruwais field, overcoming severe formation overpressure and wellbore instability. The solution marked the first MPD operation in the UAE and achieved the longest bearing assembly rotation in the country, while reducing rig-up and rig-down times as well as connection times. These advancements have set a new standard for future gas well operations in the region.

Exploratory gas wells in the Ruwais field, located onshore in Abu Dhabi, present significant operational challenges due to wellbore instability and high background gas levels. These conditions often lead to well control issues, NPT, and increased risk of tool failures—particularly during critical operations such as connections, pore pressure tests, and bearing installations.

The objective was to optimize drilling efficiency by lowering mud weight while maintaining a constant bottomhole pressure (BHP) through enhanced equivalent circulating density (ECD) and ESD. Previous attempts to address these challenges with conventional drilling methods and early MPD adoption resulted in increased drilling times and did not fully mitigate the risks of formation overpressure and instability. As a result, the operator sought a solution that would optimize MPD efficiency, extend bearing life, and minimize downtime during connections and bearing changes.

SLB deployed a comprehensive suite of MPD technologies to address the unique challenges of the Ruwais field. The solution included SLB MPD engineering, the first deployment of the compact above-tension-ring (ATR) rotating control device (RCD) in the Eastern Hemisphere for an onshore operation, the SRS-5 bearing assembly for increased bearing life, and the @balance Control™ MPD systems for automated operations and precise formation pressure calibration.

By using an underbalanced mud weight of 15.50 lbm/galUS, the MPD system maintained constant BHP during both dynamic and static conditions. This approach prevented well integrity issues, circulation losses, and influxes, enabling the operator to reach TD without any NPT related to circulation losses. The operation achieved an impressive average ROP exceeding 96 ft/h in the lateral section and set a record for the longest bearing assembly rotation in the UAE at 112 h.

Operational efficiencies were further demonstrated by a 66% reduction in rig-up and rig-down time and a 29% decrease in MPD connection time compared to previous competitor performance. The successful implementation of these technologies not only ensured reliable and efficient well delivery but also increased the operator’s confidence in applying MPD solutions to future wells. Key learnings from this project have informed new drilling processes and procedures, reinforcing a culture of operating better, faster, and smarter in the challenging environments of the Ruwais field.